Skip to content
Stabilising SH35/SH2
Road Construction Highway Stabilisation

Stabilising SH35/SH2

Parata has been engaged in ongoing stabilisation works along the SH35 and SH2 corridors, two of the most critical transport routes serving the East Coast and Eastern Bay of Plenty regions. These highways are vital lifelines for rural communities and have been significantly impacted by severe weather events. Our stabilisation programme includes road surface repairs, shoulder reinforcement, retaining structures, and drainage improvements designed to improve resilience and extend the service life of these essential routes.

  • Road surface stabilisation and repair
  • Shoulder reinforcement
  • Retaining wall construction
  • Drainage improvements
  • Pavement rehabilitation
Stabilising SH35/SH2 - Image 1
Stabilising SH35/SH2 - Image 2
Stabilising SH35/SH2 - Image 3

Project Details

Client
NZTA / Waka Kotahi
Location
SH35 & SH2 Corridors
Year
2023-2024
Category
Road Construction
Type
Highway Stabilisation

READY TO START YOUR
PROJECT?

Get in touch with our team for a free consultation and discussion about your construction needs.